CUSTOMER |
NAME OF WORK |
DETAILS |
LOCATION |
PT. FUJI FURUKAWA E & C INDONESIA |
TO PROVIDE SUPPORT & INSTALL CONDUIT PIPE FOR ELECTRICAL EQUIPMENT ( MOTOR SENSOR ) ALL PRODUCT YARD |
2017 |
MAIN CONTRACTOR |
PURWAKARTA |
M/E WORK FOR INSTALLATION OF NEW M/C & RELOCATION OF EXISTING M/C |
DRAIN PIPE OF BCP SYSTEM IN ZONE-2 |
PACKAGE B-1.4 LOW VOLTAGE INSTALLATION WORK |
CONSTRUCTION BATTERY CHARGING PANEL ROOM & RE-WIRING BATTERY CHARGING SYSTEM |
NEW BATTERY CHARGING TANK ( 6 UNITS ) IN ZONE-2 |
FREEMING TANK WORK TO COOLING TOWER SYSTEM |
PT. INDOTRUCK UTAMA |
MAINTENANCE PARKING SYSTEM |
2017 |
MAIN CONTRACTOR |
KARAWANG |
PT. KYOKUTO INDONESIA |
INSTALLATION PARKING SYSTEM |
2017 |
MAIN CONTRACTOR |
KARAWANG |
PT. KANEMATSU KGK |
PRIMARY ELECTRICAL WORK ( FROM PLN GARDU TO ELECTRICAL ROOM) |
2017 |
MAIN CONTRACTOR |
BANDUNG |
PT. NOK INDONESIA |
HIGH SPEED SHEET SHUTTER "MONBAN" GF |
2017 |
MAIN CONTRACTOR |
CIKARANG |
STEEL DOOR MODIFICATION |
PT. S-TECH INDONESIA |
INSTALLATION COMPRESSOR SYSTEM PT. RE PAL |
2017 |
MAIN CONTRACTOR |
SURABAYA |
PT. YKK ZIPPER INDONESIA |
LVMDB NO. 4 & DB SDY NO. 4 |
2017 |
MAIN CONTRACTOR |
CIBITUNG |
PUSH UNIT, POWER & JIG SCREW FOR M/C |
PARTITION IN COMPRESSOR ROOM |
PT. YKK ZIPPER INDONESIA |
PIPING PIPE WATER SUPPLY & PIPING PIPE AIR COMPRESSOR FOR NEW W.W.T |
2017 |
MAIN CONTRACTOR |
CIMANGGIS |
|
DEMOLISHING & INSTALLATION OF TDM M/C ( 6 UNIT ) |
|
|
|
PT. NISSIN FOOD INDONESIA |
HIGH SPEED SHEET SHUTTER "MONBAN" NO. 99703 & 99704 |
2017 |
MAIN CONTRACTOR |
CIKARANG |
PT. PELANGIRAYA INDONESIA |
INSTALLATION A/C DUCT WORK IN FUJI SET INDONESIA |
2017 |
MAIN CONTRACTOR |
JAKARTA |
FLEXIBLE HOSE TO A/C DUCT SYSTEM |
PRODUCTION ROOM PARTITION WORK ( STEP - 2 ) WITH TEMPERED GLASS t. 8 mm ATTACHED ANTI STATIC FILM t. 0.2 mm IN PT. SUGITY PROJECT. |
EXPANSION CANOPY |
PT. FUJI FURUKAWA E & C INDONESIA |
ELECTRICAL INSTALLATION WORK OF BAR & SMALL SECTION MILL OF KOS NEW PLANT ( PACKAGE C-1 ) |
2016 |
MAIN CONTRACTOR |
PURWAKARTA |
REPOSITION OF BATTERRY CHARGING |
PT. INOAC POLYTECHNO INDONESIA |
MECHANICAL & ELECTRICAL WORKS FOR UTILITY FACTORY FOAMING M/C |
2016 |
MAIN CONTRACTOR |
TANGERANG |
ELECTRICAL WORKS FOR HANNECKLE M/C ( UTILITY FACILITY ) |
PT. YKK AP INDONESIA |
CAPACITOR & REACTOR REPLACEMENT WORK FOR S/S-7LVMDB 200 KVA CAPACITOR BANK CUBICLE |
2016 |
MAIN CONTRACTOR |
TANGERANG |
PT. YKK ZIPPER INDONESIA |
DEMOLISHING & SETTING OF NEW M/C ( DIE CAST 4 UNITS ) & NEW INSTALLATION OF PIPING WORK |
2016 |
MAIN CONTRACTOR |
CIMANGGIS |
PT. YKK ZIPPER INDONESIA |
CEILING WORK FOR ELASTIC AREA |
2016 |
MAIN CONTRACTOR |
CIBITUNG |
REPAIRING OF LVMDB NO. 4 & DB SDY NO. 4 |
M & E WORK FOR NO. 9 MONOFILAMENT & DRYER M/C |
POWER FOR DTY AHU |
M & E WORK FOR PIRN WINDER M/C |
FAULTY SUPPORT & RE-PAINTING WORK OF SILO STRUCTURE |
PT. YKK ZIPCO INDONESIA |
M & E WORK FOR DIE CAST M/C ( 7 UNITS ) |
2016 |
MAIN CONTRACTOR |
CIBITUNG |
CHILLED WATER SUPPLY PUMP FOR DIE CAST AREA |
INSTALLATION OF WATER SUPPLY, COMPRESSED AIR PIPING & POWER WIRING |
PT. KYOKUTO INDONESIA |
MAINTENANCE OF PARKING SYSTEM IN PT. INDOTRUCK UTAMA |
2016 |
MAIN CONTRACTOR |
KARAWANG |
PT. TOKO ENGINEERING INDONESIA |
MECHANICAL & ELECTRICAL WORKS FOR BAR & SMALL MILL |
2016 |
MAIN CONTRACTOR |
TANGERANG |
TEMPORARY CONSTRUCTION POWER PLANT ( R2 ) |
PT. DAIDO INDONESIA MANUFACTURING |
REPLACEMENT CHAIN CONVEYOR FOR 4 LINE |
2015 |
MAIN CONTRACTOR |
CIKAMPEK |
RELAY TEST, VCB TRIP TEST & MISCELLANEOUS TEST |
PT. INOAC POLYTECHNO INDONESIA |
PANEL FOR TPV |
2015 |
MAIN CONTRACTOR |
TANGERANG |
ELECTRICAL WORK FOR PAINTING BOOTH |
CABLE RACK FOR OUTPUT PP - PRODUCTION MACHINE |
CABLE RACK FOR BOOTH / OVEN PANEL |
REPLACEMENT WORK FOR PAINT LINE |
PT. MAYEKAWA INDONESIA |
PIPING SYSTEM & ELECTRICAL WORK FOR ATI FACTORY - 2 |
2015 |
MAIN CONTRACTOR |
SURABAYA |
PT. ALTECH |
SERVICE INSTALLATION MECHANICAL & ELECTRICAL |
2015 |
MAIN CONTRACTOR |
SUKABUMI |
MECHANICAL & ELECTRICAL FOR CHILLER SYSTEM NO. 2 |
PT. KONOIKE TRANSPORT INDONESIA |
UNLOADING, OPEN CASE, POSITIONING OF MACHINE |
2015 |
MAIN CONTRACTOR |
CIBITUNG |
HIROCHIKU CO. LTD |
MODIFICATION OF OIL TO LNG ( LINE B ) |
2015 |
MAIN CONTRACTOR |
KARAWANG |
DUCTING PLATE |
DUCTING FOR HURRY MELTER III - 1000 |
PT. YKK AP INDONESIA |
ANALYSYS OF D/G SET EMISSION EXHAUST GAS |
2015 |
MAIN CONTRACTOR |
TANGERANG |
PT. YKK ZIPPER INDONESIA |
MECHANICAL & ELECTRICAL WORK FOR NEW PAINTING M/C |
2015 |
MAIN CONTRACTOR |
CIMANGGIS |
REPLACEMENT WORK FOR HYDRANT PILLAR NO. 45 |
CLEANING & REPAINTING FOR DUST COLLECTOR DIE CAST LINE |
FLOW METER FOR INCENERATOR |
PT. YKK ZIPPER INDONESIA |
FIRE ALARM SYSTEM FOR GENSET ROOM |
2015 |
MAIN CONTRACTOR |
CIBITUNG |
CORRODED PIPE FOR COOLING TOWER |
M & E WORKS FOR NEW INSPECTION M/C & SEWING M/C |
PT. YKK ZIPCO INDONESIA |
CIVIL, MECHANICAL & ELECTRICAL WORK FOR INSATLLATION OF NEW BOILER |
2015 |
MAIN CONTRACTOR |
CIBITUNG |
COVER FOR PIT |
FOUNDATION WORK & REPLACEMENT FOR NO. 12 DYEING M/C |
TABLE FOR SCALE |
STEEL PLATE FOR HIRAKAKU M/C & PLATING M/C |
RELOCATION WORK FOR EXISTING PRESS M/C FROM ZIPCO-3 TO ZIPCO - 5 |
PT. ITO TAKA CONSTRUCTION |
MECHANICAL & ELECTRICAL WORK OF BUILDING FACILITY FOR UNICRAFT NAGURA PROJECT |
2014 |
MAIN CONTRACTOR |
KARAWANG |
MECHANICAL & ELECTRICAL WORK OF PRODUCTION M/C LOAD FOR UNICRAFT NAGURA PROJECT |
MECHANICAL & ELECTRICAL WORK OF OHKUMA |
PT. GRAND PURI MITRA INTERNATIONAL |
MECHANICAL & ELECTRICAL WORK FOR GRAND PURI HOTEL |
2014 |
MAIN CONTRACTOR |
CIKARANG |
MECHANICAL & ELECTRICAL WORK FOR GRAND PURI APARTMENT |
PT. FUJI FURUKAWA ENGINEERING |
SUPPLY OF MATERIALS FOR TIGAR 50 TPD PROTOTYPE PLANT ( IHI INDONESIA ) |
2014 |
MAIN CONTRACTOR |
JAKARTA |
PT. SHARP ELECTRONIC INDONESIA |
DRAIN SYSTEM FOR BOILER ( CABINET & DOOR VIU ) |
2014 |
MAIN CONTRACTOR |
CAKUNG |
PT. NEC INDONESIA |
1 YEAR BACKUP INSTALL OF DATA CABLE |
2014 |
MAIN CONTRACTOR |
CIKAMPEK |
MAINTENANCE SERVICE CONTRACT OF PUBLIC ADDRESS SYSTEM |
AS-BUILD MAKING & ENGINEERING WORK |
PT. YKK ZIPPER INDONESIA |
WATER SUPPLY PIPE FOR MONOFILAMENT M/C |
2014 |
MAIN CONTRACTOR |
CIBITUNG |
REPAIRING OF FA PANEL & SURGE ARRESTER |
COVER PLATE FOR MEZZANINE FLOOR ( SPINNING AREA ) |
PT. METAL ONE INDONESIA |
SECONDARY WIRING OF M/C |
2014 |
MAIN CONTRACTOR |
CIKARANG |
LAN SYSTEM |
POWER WIRING FOR CROSS UNIT & VACUUM M/C |
PT. TOKO ENGINEERING INDONESIA |
MECHANICAL & ELECTRICAL WORK OF NEW OFFICE & WARE HOUSE |
2014 |
MAIN CONTRACTOR |
TANGERANG |
PT. INTER ACT JAKARTA |
LAN SYSTEM & PUBLIC ADDRESS SYSTEM FOR EXPANTION MANUFACTURE AREA |
2014 |
MAIN CONTRACTOR |
SUBANG |
PABX SYSTEM |
INSTALLATION DATA OF B1 FOR FOUNDATION AREA |
PT. TOSPLANT ENGINEERING INDONESIA |
ELECTRICAL WORK FOR TJP REPLACING LIGHTNING PROJECT |
2014 |
MAIN CONTRACTOR |
CIKARANG |
PT. FUJI FURUKAWA E & C INDONESIA |
MECHANICAL & ELECTRICAL WORK OF FURUKAWA INDOMOBIL BATTERY MFG PROJECT |
2014 |
MAIN CONTRACTOR |
PURWAKARTA |
SECONDARY MECHANICAL WORK |
MECHANICAL & ELECTRICAL WORK OF WWTP AREA |
COOLING TOWER PIPE, PANEL & INSTALLATION |
ELECTRICAL MANHOLE RELOCATION ( GUARD HOUSE ) |
INSTALLATION PP PIPE OF SCRUBBER IN ZONE 2 |
PT. TATA NUSA TIARA INTERNATIONAL |
M/E DESIGN & THE DESIGN SUPERVISION SERVICE FOR PT. ANEKA TUNA INDONESIA 2nd FACTORY |
2013 |
MAIN CONTRACTOR |
PANDAAN |
PT. S-IK INDONESIA |
RELOCATION WORK FOR EXTRUDER M/C ( LINE M ) |
2013 |
MAIN CONTRACTOR |
CIKARANG |
POWER WIRING WORK FOR EXTRUDER M/C LINE M |
COOLING WATER PIPING, VACUUM PUMP PIPING & COMPRESSOR PIPING WORK |
DUCTING WORK ( LINE M ) |
PARTITITION PLASTIC DOOR EXTRUDER M/C LINE M ( 2nd, 3rd & TOP ) |
VENTILATION WORK OF INVERTER PANEL FOR EXTRUDER |
PT. TOSPLANT ENGINEERING INDONESIA ( KERAMASAN - PALEMBANG ) |
SUPPLY LIGHTING FIXTURES & ACCESSORIES |
2013 |
MAIN CONTRACTOR |
PALEMBANG |
ENGINEERING WORK FOR LIGHTING & SMALL POWER SYSTEM ( INDOOR PORTION ) 80 MW GAS |
PT. TOSPLANT ENGINEERING INDONESIA ( KANSAI PAINT - CIKARANG BARAT ) |
MECHANICAL INSTALLATION WORK FOR KPIN F-2 |
2013 |
MAIN CONTRACTOR |
CIKARANG |
MECHANICAL PIPING & INSULATION WORK FOR KPIN |
ELECTRICAL WORK FOR KPIN |
TEMPORARY HOUSE WORK FOR KPIN F-2 |
PT. YKK AP INDONESIA |
RENOVATION OF FIRE HYDRANT SYSTEM |
2013 |
MAIN CONTRACTOR |
TANGERANG |
INSTALLATION OF KWH METER FOR CONTAINER HEATER PANEL |
RECTIFIER CABLE WIRING WORK |
PT. MEGMILK SNOW BRAND |
MECHANICAL & ELECTRICAL WORK FOR SNOW BRAND |
2013 |
MAIN CONTRACTOR |
CIKARANG |
SECONDARY WIRING & PIPING WORK |
MAIN WATER FILTER |
TABLE FOR GRINDER MACHINE |
PT. IHARA MFG. INDONESIA |
SLUG CAR HM - III - 1500 |
2013 |
MAIN CONTRACTOR |
CIBITUNG |
TROLLY SLUG CAR HM - III - 1500 |
PT. INOAC POLYTECHNO INDONESIA |
INSTALLATION OF EARTH FAULT ALARM SYSTEM |
2013 |
MAIN CONTRACTOR |
TANGERANG |
TEMPORARY FIRE ALARM WORK |
PT. TOKYO KOEKI INDONESIA |
WATER SUPPLY & DRAINAGE PIPING SYSTEM FOR PLAZA TOWER |
2013 |
MAIN CONTRACTOR |
JAKARTA |
PT. INDONESIA STEEL TUBE WORKS. |
135 KVA GENSET INSTALLATION WORK |
2013 |
MAIN CONTRACTOR |
JAKARTA |
PT. YKK ZIPCO INDONESIA |
REPLACEMENT OF AXIAL FAN FOR BARREL PEEL ROOM |
2013 |
MAIN CONTRACTOR |
CIBITUNG |
CORRODED AIR SUPPLY FAN FOR DIE CAST AREA |
PT. INOAC POLYTECHNO INDONESIA |
HYDRANT PIPING SYSTEM |
2013 |
MAIN CONTRACTOR |
KARAWANG |
INSTALLATION OF AUTOMATIC FIRE ALARM SYSTEM |
INSTALLATION OF LIGHTING SYSTEM |
PT. METAL ONE INDONESIA |
MECHANICAL & ELECTRICAL WORKS |
2013 |
MAIN CONTRACTOR |
CIKARANG |
PT. DAIDO INDONESIA MANUFACTURING |
REPLACEMENT FOR DUST COLLECTOR IMPELLER |
2013 |
MAIN CONTRACTOR |
CIKAMPEK |
CANOPY OF DUST COLLECTOR NO. 4 |
PT. HIROCHIKU ASIA INDONESIA |
TOP COVER & ALUMINIUM MELTING FURNACE REMODELING ( ASTRA HONDA MOTOR ) |
2013 |
MAIN CONTRACTOR |
KARAWANG |
INSTALLATION OF HOLYMESSY E 2000 S ( HPM ) |
LINE E MELTING FURNACE |
PT. ITO TAKA CONSTRUCTION |
MECHANICAL & ELECTRICAL WORK FOR PT. KAWAI KASEI NEW FACTORY |
2012 |
MAIN CONTRACTOR |
KARAWANG |
MECHANICAL & ELECTRICAL WORK FOR PT. KCF IND. NEW FACTORY |
PT. NEC INDONESIA |
RAISED FLOOR FOR IT ROOM ( YAZAKI - SUBANG ) |
2012 |
MAIN CONTRACTOR |
DEPOK |
UTP CABLING SYSTEM ( YAZAKI - TRAINING CENTER ) |
TELEPHONE CABLING SYSTEM YAZAKI SUBANG |
PUBLIC ADDRESS SYSTEM FOR YAZAKI SUBANG FACTORY |
PT. S-IK INDONESIA |
PAGING SYSTEM FOR PRODUCTION & WAREHOUSE |
2012 |
MAIN CONTRACTOR |
CIKARANG |
COOLING WATER, VACUUM PUMP & COMPRESSOR PIPING WORK ( LINE J ) |
MIDDLE HOPPER M/C LINE J ( SUS 304 ) |
RELOCATION WORK FOR LINE J |
PT. YKK ZIPCO INDONESIA |
MECHANICAL & ELECTRICAL WORKS FOR DIE CAST M/C ( 8 UNITS ) |
2012 |
MAIN CONTRACTOR |
CIBITUNG |
ELECTRICAL WORK FOR MELTING FURNACE |
PT.YAMAHA MOTOR MANUFACTURING WEST JAVA |
MECHANICAL & ELECTRICAL WORKS FOR ENGINE LINE A FACTORY - 1 |
2012 |
MAIN CONTRACTOR |
KARAWANG |
INSTALLATION FUEL PUMP OF FIRING BENCH FOR LINE A & B |
GASOLINE PIPE FOR FACTORY 1 & 2 |
MECHANICAL & ELECTRICAL WORKS FOR WARMING UP |
ELECTRICAL WORK & FABRICATION BUCKET FOR SHOT BLAST MANUAL |
MODIFICATION SAFETY LIFTER OF FURNACE LINE C FOR DIE CASTING |
PT. YKK AP INDONESIA |
REPLACEMENT OF EXISTING FAULTY PANELS |
2012 |
MAIN CONTRACTOR |
TANGERANG |
PT. SUZUKI INDOMOBIL MOTOR |
MODIFICATION OF MAIN COOLING WATER PIPING |
2012 |
MAIN CONTRACTOR |
TAMBUN |
RENOVATION WORK FOR COOLING TOWER |
COOLING WATER PIPING WORK FOR INJECTION M/C |
BO 1 / BO 2 INNER PIPING CHANGE WORK |
PT. NEC INDONESIA |
YAZAKI TRAINING CENTER - SUBANG UTP CABLING SYSTEM |
2012 |
MAIN CONTRACTOR |
CIKAMPEK |
TRINITY INDUSTRIAL CORP. |
TOP COAT SMALL BOOTH |
2012 |
MAIN CONTRACTOR |
KARAWANG |
UNDER COAT SMALL BOOTH |
MECHANICAL & ELECTRICAL WORK |
LIGHTING FIXTURES |
MANUAL DAMPER |
COLD INSULATION WORK |
CHILLED WATER TANK CAP. 200 M³ |
PAINT MIXING ROOM EXHAUST FAN |
ELECTRICAL WORK OF # 2 PAINT SHOP PROJECT |
PARTITION WORK FOR CHILLER ROOM |
JIG & DOLLY CLEANING & PAINT HOSPITAL |
WATER SOFTENER |
PARTS LIST CHILLER SYSTEM |
DOOR & WINDOW |
TOP COAT INSPECTION LIGHTING WORK |
PT. TOYOTA TSUSHO MECHANICAL & ENGINEERING SERVICE INDONESIA |
SLUDGE DOLLY & SLUDGE DOLLY YARD - SUGITY |
2012 |
MAIN CONTRACTOR |
KARAWANG |
CURTAIN BETWEEN PROCESSAND PROCESS - SUGITY |
HIGH VISCOS ENCLOSURE + AC, AC FOR PRIMER & TOP COAT |
WATER PUMP & DRAIN PIPING - SUGITY |
PT. YKK ZIPPER INDONESIA |
PARTS & MODIFICATION OF PARTS FOR NO. 4 SDY M/C |
2012 |
MAIN CONTRACTOR |
CIBITUNG |
INSULATION OF MAIN HOPPER & SECONDARY DRYER M/C FOR NO. 8 MONOFILAMENT |
INSULATION OF EXTRUDER BODY & HEAD FOR NO. 8 MONOFILAMENT |
SURGE COUNTER BOX FOR 1 UNIT LIGHTING HEAD ( KAWASAN ) |
FIRE ALARM SYSTEM FOR GBJ / WAREHOUSE ( PPD ) |
EMERGENCY ALARM FOR SECURITY SYSTEM |